Tillicoultry Quarries

New concrete plant opens at Clydebridge

A new concrete plant has been commissioned at the existing Clydebridge site. This new concrete plant is now ready for full production from uplifts to Tillicoultry Quarries mixers.
Minimum batch size will be 1 cubic metres.

This brings the total concrete plants operated by Tillicoultry Quarries Limited to four across the central belt of Scotland.